INTEGRATED SOLUTIONS, INC.
QUALITY ASSURANCE PROCEDURE
Prepared By:
______________________________________________________________________________
Lead Author, Integrated Solutions Date
Approved By & Effective on Date of Signature Below:
______________________________________________________________________________
Yufen Chang Yu, Integrated Solutions Date
THIS DOCUMENT IS TO BE REGARDED AS THE OFFICIAL QUALITY ASSURANCE PROCEDURE WITHIN INTEGRATED SOLUTIONS. IT IS TO BE MAINTAINED UNDER CHANGE CONTROL BY THE DOCUMENT CONTROL COORDINATOR.
CHANGE SHEET
Title: Integrated Solutions Quality Assurance Procedure
DESCRIPTION OF CHANGE
ISSUE |
DATE |
SECTION |
DESCRIPTION |
1.0 |
12/2/97 |
All |
|
2.0 |
2/23/98 |
4.3 |
|
1.0 POLICY
Integrated Solutions, Inc. will provide Quality Assurance for its customers. They will follow the Procedure defined in this document. Deviations in this procedure will be noted and the procedure will be updated as necessary.
2.0 PURPOSE
The purpose of this policy is to:
3.0 INTRODUCTION
This document describes the reason for and the procedure to perform Quality Assurance within the Integrated Solutions, Inc. organization. It documents the steps taken by the client / customer and the Integrated Solutions, Inc. Quality Assurance Coordinator.
Quality Assurance is a necessary function within Integrated Solutions, Inc. to ensure that technical support is performed in a timely manner and is documented from beginning to end within the Integrated Solutions, Inc. ticketing system.
4.0 GENERAL PROCEDURES
4.1 Identifying a Problem
4.2 Entering Complaint into Ticketing System
6.) On the next line, type in the description of the problem that the Client / Customer is having
7.) Enter
8.) Press Control D (the Control key and the letter D at the same time) to send the
the ticket to the Integrated Solutions, Inc. Support Team
9.) Designate a Priority for the ticket
The Quality Assurance Coordinator follows up on each of the tickets on a monthly basis.
follow up on monthly
(This list is based on the status reports handed into the President / CEO by the
System Administrators)
a Customer Survey List based on the answers he / she receives
Quality Assurance Coordinator
Integrated Solutions, Inc.
Customer Survey List
Date Surveyed: _________________
User’s Name: ___________________ User’s Phone: ________________
ISI Quality Person: ________________________
Ticket Number: _____________________ S.A. Name: ______________________
Ticket Opened: _____________________ Ticket Closed: ____________________
Date / Time Date / Time
User’s Response: service level only at this time
____ poor ____average ____good ____ very good ____excellent
Comments / Suggestions: